Product Description
Introduction of the Ice cream cone machine:
The development of the company's cone machine designed with humanization, simple
operation, this machine is divided into the upper die and mould halves, when using temperature control knob, temperature by first tone up, wait temperature rise, upper die up, lower die fold, pour material, then will the OARS with lower die others in molding,about one or two minutes later, cone shaped, at this time will can pull up, upper die mould halves pulled open, cone will automatically fall into the following slide in and trickles out..
Parameters of the ice cream cone machine:
Item No |
Dimension(mm) |
Cone pics |
Capacity(pcs/hour) |
Opening and closing control |
HLDTJ-2 |
450*350*700 |
2/batch |
50-60 |
by hand |
HLDTJ-4 |
530*430*650 |
4/batch |
100-120 |
by hand |
HLDTJ-10 |
760*600*1050 |
10/batch |
250-300 |
by hand |
HLDTJ-12 |
800*700*880 |
12/batch |
300-350 |
by hand |
HLDTJ-24 |
1050*800*900 |
24/batch |
600-800 |
by hand |
HLDTJ-32 |
1200*800*900 |
32/batch |
800-1000 |
by hand |
HLDTJ-40 |
1080*800*1440 |
40/batch |
1200-1400 |
by hand |
Packaging & Shipping
Packing: inside plastic bag, outside wooden case for poultry feed pellet making machine (Based on the customers' need adopt the wooden case or wooden pellets, etc.).
Transportation: shipping, train, express or upon clients' demands.
DELIVERY TIME:
3-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.
Company Information
Zhengzhou hongle machinery & equipment co.ltd
is engaged in the development, design, manufacture and sale of food processing machinery. over the years adopts many new ideas, absorbs a wide range of advanced technologies worldwide as well as excellent processing and testing equipment, and takes a reliable strict quality guarantee system and an important after-sales service system to win customer's trust in the industry.
Our Service
1. Installation and Debugging: Within the time of warranties, the seller will send the engineer to guide to install the machine, the buyer should prepare the materials needed and should be responsible for the engineer's safety, travel expense, accommodation abroad. And shall pay the salary for the engineer,150 dollars per day, and if the installation would exceed one month, then the buyer shall pay the engineer 200 dollars per day for the exceeding time. And the seller will provide the Instruction Manual and the Foundation Drawings.
2. The quality assurance date is one year (exclude the quick wear parts) after commissioning, but not exceed 15 months from date on which machine leaves the factory.
3. If the equipment appear the equipment failure because of improper handling
of user, we are in charge of maintenance, and collect the appropriate cost.
4. We offer the components with favorable price, perdurable maintenance.
After quality assurance date, if the equipment needs to be repaired, we only collect the cost price
FAQ
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.
5) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.