Customization: | Available |
---|---|
Certification: | CE |
Power Source: | Electric |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction:
1.This flavoring machine has advantages of simplified operation,smooth,fine and bright tablet surface.
2.It saving auxiliary materials and convenient maintenance.
3.It is the ideal equipment for production of sugarcoated tablets.
4.It is used to coat tablets and pius with sugar in pharmac-euticakl and food industry.
Features :
1.Flavoring machine is designed for the coating of nuts, dried fruits, cakes and other products by sugar, chocolate, vitamins and fruit shell.
2.Infinitely variable speed control software and coating drum provide high performance, ease of management, ease of use.
3.The drums have a reliable and sealed lubrication system. Drum is made of stainless steel, the body is
4.The drums have a reliable and sealed lubrication system. Drum is made of stainless steel, the body is painted with white enamel. The drum is equipped with rubber pads which protect against vibration. Comfortable and easy to maintain and operate
5.Automatic discharging type is available.
Model | Size(mm) | Weight(kg) | Power(kw) | Capacity(kg/h) | Roller diameter(mm) |
HLCY800 | 1000*800*1300 | 130 | 1.1 | 300 | 800 |
HLCY1000 | 1100*1000*1300 | 150 | 1.5 | 500 | 1000 |
Packing: inside plastic bag, outside wooden case for poultry feed pellet making machine (Based on the customers' need adopt the wooden case or wooden pellets, etc.).
Transportation: shipping, train, express or upon clients' demands.
1. Installation and Debugging: Within the time of warranties, the seller will send the engineer to guide to install the machine, the buyer should prepare the materials needed and should be responsible for the engineer's safety, travel expense, accommodation abroad. And shall pay the salary for the engineer,150 dollars per day, and if the installation would exceed one month, then the buyer shall pay the engineer 200 dollars per day for the exceeding time. And the seller will provide the Instruction Manual and the Foundation Drawings.
2. The quality assurance date is one year (exclude the quick wear parts) after commissioning, but not exceed 15 months from date on which machine leaves the factory.
3. If the equipment appear the equipment failure because of improper handling
of user, we are in charge of maintenance, and collect the appropriate cost.
4. We offer the components with favorable price, perdurable maintenance.
After quality assurance date, if the equipment needs to be repaired, we only collect the cost price