Customization: | Available |
---|---|
After-sales Service: | Oline Service |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction:
The automatic production line of moon cake is composed of granule stuffing machine, moon cake forming machine and automatic plate arranging machine. The finished product is transported step by step and the speed is adjustable, which is convenient for manual picking up or matching of the moon cake forming; The operating system adopts PLC and touch screen, with stepless adjustable speed and memory function, which makes the equipment operation easy to learn and understand; The moon cake forming machine and automatic plate arranging machine are powered by pneumatic and stepping motor, photoelectric detection and PLC control, with simple and reasonable structure and high degree of automation.
The operation is stable, reliable and hygienic. The production line is mainly used in the production line of moon cake, and the stuffing function can adapt to different conditions stuffing, mainly used for stuffing hard stuffing (whole peanut, nuts, etc. do not damage the package), such as five kernel stuffing;The ratio of filling and skin can be adjusted at will. The moon cake forming machine can flexibly change the molds with different sizes and patterns, In order to make all kinds of moon cakes. According to the needs of customers, we can change the corresponding components to produce different products, namely cantonese moon cakes;
Package speed | 20-60pcs/min |
Package Scope | 20-200g |
Stuffing ratio | 1.5:8.5/5.5 |
Rated voltage | 380v |
Size | 96*86*145cm |
Weight | 335kg |
Forming speed | 10-70pcs/min |
Product weight | 20-300g |
Output direction | Left in / right out |
Rated voltage | 220v |
Size | 160*55*143cm |
Weight | 108kg |
Applications:
PACKAGE:
Standard export carton packing.
DELIVERY TIME:
3-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.
1. Installation and commissioning: during the warranty period, the seller will send the engineer to guide the installation. The buyer shall prepare the required materials and be responsible for the safety, travel expenses, foreign accommodation and other responsibilities of the engineer. And shall pay the engineer a salary of 150 dollars / day, and if the installation exceeds one month, the buyer shall pay the engineer an overdue wage of 200 USD / day. The seller will provide the instruction and basic drawings.
2. The quality assurance period is one year after commissioning (excluding vulnerable parts), but it shall not exceed 15 months from the date of delivery of the machine.
3. If the equipment fails, it means that it is caused by improper operation
For users, we are responsible for the maintenance and charge the corresponding fees.
4. The price of the parts we offer is favorable and durable.
After the warranty period, if the equipment needs to be repaired, we only charge the cost price
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.
5) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.