Introduction :
It has been designed and manufactured to mould and pack(on the side only) fresh minced meat hamburger without bones(with optimum temperature at 4ºC), in particular for products such as :minced meat without bones,fish,mixture of fresh foodstuff,etc.
The standard machine is used to mould hamburgers whose weight can be adjusted by means of suitable mechanic device. The height can be adjusted between min.6mm and max.16 mm.
And the max diameter of the hamburger is 100mm. Upon request, the machine can be equipped with optional moulding rollers with different mould shape.
Technical Parameters
Material: stainless steel
Model |
HL-I |
HL-II |
HL-III |
Capacity |
35 pcs/min |
70pcs/min |
105 pcs/min |
Material tank |
32 L
|
32 L
|
32 L
|
Power |
0.55kw |
0.55kw |
0.55kw |
Voltage |
220v/50Hz
|
220v/50Hz
|
220v/50Hz
|
Material |
stainless steel |
stainless steel
|
stainless steel
|
Weight |
150 kg |
150 kg |
150 kg |
Dimension |
930mm*730mm*1620mm
|
930mm*730mm*1620mm |
930mm*730mm*1620mm
|
Packing: inside plastic bag, outside wooden case for poultry feed pellet making machine (Based on the customers' need adopt the wooden case or wooden pellets, etc.).
Transportation: shipping, train, express or upon clients' demands.
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.
5) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.