Customization: | Available |
---|---|
After-sales Service: | Oline Service |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Features of biscuits production line
HL automatic biscuit production line, with original design, compact structure and high automatic, is developed on the base of absorbing Japanese technology. All working procedures that from dough feeding, sheeting, molding, waste recycling, baking to cooling can be completed automatically in one line. Hundreds of moulds and dozens of technology recipes make it possible to produce all kinds of popular biscuits, such as cream biscuit, layer biscuit, calcium biscuit, multi-vitamin biscuit, vegetable biscuit, etc.
Model No. | Production capacity | Width of conveying belt | Power rate for tunnel oven | Voltage |
HL-250 | 50-100kg/h | 250mm | 4.5kw/m | 380V,50Hz |
HL-400 | 100-200kg/h | 400mm | 6.75kw/m | 380V,50Hz |
HL-600 | 300-500kg/h | 600mm | 8kw/m | 380V,50Hz |
HL-800 | 600-800kg/h | 800mm | 9kw/m | 380V,50Hz |
HL-1000 | 900-1000kg/h | 1000mm | 10.8kw/m | 380V,50Hz |
Transportation: shipping, train, express or upon clients' demands.
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.
5) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.