Introduction:
HL-MT-10 computer quantitative packaging machine. Mainly composed by the mainframe, conveyor, sewing machine, computer controller, and other parts. The mainframe belt downloads stuff with frequency conversion control. Measuring accuracy. Convenient equipment clean. Do not plug material.
The mainframe control:
1.Screen PLC control instrument.
2.The mainframe belt downloads stuff with frequency conversion control.
3.Class production, nissan, the total information automatic storage function.
Technical Parameter:
Filling machine:
Model |
HL-MT10 |
Weighing capacity
|
3 ~ 4 bags/min
|
Weighing scope
|
2.5-10 kg/bag |
Voltage
|
380V |
Controlling means
|
PLC Microcomputer comtrol |
For the gas
|
Without oil, clean gas meter
|
Pressure force
|
0.4---0.5MPa |
Gas consumption
|
0.4Nm3/min |
Conveyor
conveyor length |
Conveyor speed
|
.conveyor belt width |
maximum transferring capacity
|
For electricity
|
power |
1.8m |
5-20m/min |
400mm |
15bags/ min |
AC380V |
1.1kw |
Sawing Machine
Model |
largest sewing speed |
Stitch length
|
The largest sewing thick
|
Thread specification
|
Electricity
|
Power |
YHGK3-18 |
1700 needle/min
|
6.5-11mm |
8 mm |
21S/5,20S/3Dacron line,30S/ cotton thread
|
AC380V |
0.55kw |
More Details
Related Product
Filling range:5-50kg
Related Products
Packing and shipping
PACKAGE: Standard export carton packing
DELIVER TIME: 3-20 days after confiming ording,detail delivery date should be decided according to production and order quantity
Our Company
Zhengzhou hongle machinery equipment Co. Ltd.
Zhengzhou hongle Machinery Equipment Co., Ltd has been designing, developing, manufacturing and marketing Machinery for more than 12 years.After these years of development, we have high quality professional teams, skillful talents, strong technical force, strong and independent research and development capabilities, advanced production equipment and a perfect aftersale service system. So choose us, equaling to choose the competitive price and stable quality both.
FAQ
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in
your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are
manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle
all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for
manufacturing.
5) What about the transportation and delivery date?
Normally we use shipment to transport the goods.It is about 25-40 days.It also depends on which country and port you are. If there
are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
Any questions pls contsct me freely!