Customization: | Available |
---|---|
After-sales Service: | Oline Service |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Use of oven machine:
This machine can provide a stable test space for preheating, drying, changes about physics and chemistry testing . It supplys precision temperature controllter with high stability of platinum resistance to temperature that makes temperature well distribution.
Character of oven machine:
1.New long- axis motor which is resistant to the high temperature,turbine fan.
Silicon packing.
2.Super temperature protection:exceed-load Automatic Power Off system.Temperature controller:PID computer controller,constant temperature,Temperature compensate rapidly.
3.Timer:timer when the temperature is going, outage with warning time is OK.Choose the glass window by theMotor clients requirements,design the macine by the client's requirements.
Pizza oven:
Heating Way: gas or electric
Heating way | HL-HK3-6 Electric | HL-HK3-6 Gas | HL-HK3-9 Electric | HL-HK3-9 Gas |
Voltage | 380V50hz | 220V | 380V50hz | 220V |
Size | 1220*850*1700mm | 1340*890*1700mm | 1640*850*1645mm | 1760*920*1750mm |
Output | 90kg/h | 90kg/h | 90kg/h | 90kg/h |
Motor | 19.8kw | 450W | 24kw | 450W |
Weight | 150kg | 180kg | 195kg | 240kg |
Heating temp | 20-400ºC | 20-400ºC | 20-400ºC | 20-400ºC |
Transportation: shipping, train, express or upon clients' demands.
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.
5) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.